Editorial News

Power shutdown in parts of Chennai on December 10th

TANGEDCO announces power cut in parts of Chennai

TANGEDCO has announced that there will be power cut in parts of Chennai due to maintenance work. The power shutdown will happen on December 10th, Thursday from 9 am to 2 pm. The power is expected to be restored after 2 pm, once the work gets over.

These are the areas announced by TANGEDCO:

Entire Anna Nagar West and Anna Nagar West/Extn area, W- Block, B, C & D sector, 11th to 20th main road, Pace Builders Flats & Thiruvalleswarar Nagar, NVN Nagar, CPWD Quarters, Padikuppam Road up to Ben Foundation, Emerald Flats, Classic Apartments, Welcome Colony blocks 1 to 49 A, T V Nagar, J N Salai, Asiad, Rohini & Pioneer Colony, Sindhu Apartment, Mangalam Colony, Mullai Colony, Kurinchi Colony, Jawahar Colony, Shakthi Colony, Old L Block, Old Z Block, AL Block, 4th Avenue, Old Thirumangalam, 12th Main Road, AF Block, Nehru Nagar, 15th Main Road, 11th Main Road and AE Block.

Related posts

தைப்பூசத் திருவிழாவிற்கு இனி பொதுவிடுமுறை- முதல்வர் எடப்பாடி

Penbugs

World’s oldest Panda in captivity dies at age 38

Penbugs

திமுக கூட்டணியில் காங்கிரஸ் கட்சிக்கு 25 தொகுதிகள்

Penbugs

Delhi Court acquits Priya Ramani in MJ Akbar defamation case

Penbugs

Sheep sold for £367,500 at auction

Penbugs

சென்னை மெட்ரோ ரயில் ; இன்று இலவச பயணம்

Penbugs

மாவட்டங்களுக்கு இடையே பேருந்து போக்குவரத்துக்கும்,மாநிலத்திற்குள் ரயில் போக்குவரத்துக்கும் அனுமதி

Penbugs

தி.மு.க. தேர்தல் அறிக்கையை வெளியிட்டார் மு.க.ஸ்டாலின்

Penbugs

முன்னாள் முதலமைச்சர் ஜெயலலிதாவின் நினைவு மண்டபத்தை திறந்து வைத்த எடப்பாடி பழனிச்சாமி

Penbugs

Bangalore Literature Festival to be held on December 12-13

Penbugs

1st look of Nithya Menen in Gamanam

Penbugs

Video: Ilayaraaja wishes singer SP Balasubrahmanyam a speedy recovery

Penbugs

Leave a Comment